Annual Report 2012 - page 278

277
Tables Chapter Three
Table 3-9
New Refinery Construction Projects in OAPEC Member
Countries
Country
Project
Status 2011
Refining
Capacity
1000 b/d
Status 2012
Algeria
Tiaret
Study
100
Study
Egypt
Musturud
Study
160
Study
Ain al-Sokhna
Study
130
Postponing
Iraq
Nasiryia
Design
300
Design
Karbala
Design
140
Design
Misan
Design
150
Design
Kirkuk
Design
150
Design
Kuwait
Mina Al-Zour
Study
530
Study
Qatar
Ras-Laffan
Study
146
Engineering design
Saudi Arabia
Yanbu
Bid Evaluation
400
Bid Evaluation
Jubail
Construction
400
Construction
Ras Tanura
Engineer-
ing design
400
Engineering design
Jizan
Bid Evaluation
400
Bid Evaluation
Syria
Furoqlos
Study
140
Study
Deir Al-zour
Study
140
Cancelled
Deir Al-zour
2
-
Study
100
Cancelled
Tunisia
Skhira
Study
120
Study
UAE
Fujaira
Engineer-
ing design
200
Engineering design
Ruwais
Construction
417
Construction
1...,268,269,270,271,272,273,274,275,276,277 279,280,281,282,283,284,285,286,287,288,...383
Powered by FlippingBook